Goose Creek Landing Homeowners Association
Board of Directors Meeting
July 23, 2016
A meeting of the Goose Creek Landing Homeowners Association was held on July 23rd 2016 at the picnic shelter. All board members were present as well as approximately 20 homeowners. The meeting was called to order at 9 a.m. by board president, Louis Clark.
The minutes from the June 4, 2016 annual homeowners meeting were presented to the board members for their review. James Godfrey made a motion that the minutes be accepted as written. The motion was seconded by Hugh Kennedy and all board members voted to accept the minutes.
NEW BUSINESS
Enhancement Committee – Don Mitchell reviewed the minutes from the July 9, 2016 meeting of the enhancement committee. The committee discussed the plans for the upcoming banquet and the projects they would like to see completed with the funds
The first project would be replacement of all post and rope barriers with a block wall. The plan for the wall has been discussed for some time and a schematic drawing has been presented to the board previously. The projected cost is $22,000 but should not exceed $25,000.
The second project is the installation of Kevlar curtains around the picnic shelter. At the Enhancement Committee meeting Marty Baker presented a proposal for Kevlar curtains and had a sample of the fabric. The turnkey cost of the curtain project with the curtains being installed by the vendor would be $30,000.
The Enhancement Committee voted to present both projects to the board for consideration. Knowing there would be a shortfall of funds, the Enhancement Committee requested that the board consider using money from the general fund to cover it so that both projects could be completed before winter. James Godfrey pointed out that the decision to request the use of money from the general budget fund was not the consensus of the entire Enhancement Committee but was an idea that some wanted the board to consider.
Discussion of request
Louis updated the attendees that the board had already discussed the completion of the wall project via email. The project has been approved at a cost of $22,500 not to exceed $25,000. Materials have started to arrive and that project should be complete before the banquet. Terry reported that the vendor has done a recalculation based on the most recent drawing and the price came in around $20,000. He is hopeful that the project will come in well under budget. Currently there is $19,000 in the Enhancement checking account. The balance to complete the wall will be drawn from the proceeds of the upcoming banquet.
Terry provided information that he has obtained from the manufacturer of the curtains. He will be able to purchase them directly from the manufacturer at a cost of $19,614. The original $30,000 proposal did not include enclosures for the arches on each end of the shelter. The new proposal will enclose the ends with the same fabric. The fabric is polypropylene. Terry expects to get 15 to 25 years life from it. It is designed for saltwater environments and high wind conditions. They will be raised and lowered with a battery-powered    drill. No electrical work will be required and the installation can be completed by volunteers.
Regarding the curtain project, Louis posed the following questions to the board. #1) Do we approve it? #2) If approved, what is the timeframe for completion? #) 3 How will it be funded? One option is to take or advance the money from the general fund as requested by the enhancement committee. Another option is to wait until after the banquet and see exactly how much the shortfall is before deciding to advance any funds or to wait until after next year’s banquet until the full amount is raised.
Don Mitchell reviewed the funds currently in the enhancement account and in the general fund account, the expected net proceeds from the banquet and the balance to pay for the wall. He is projecting a shortfall of approximately $14,000. He then recommended that the shortfall be funded from the general budget. Hugh Kennedy agreed with Don’s recommendation but added that the funds could be repaid by the banquet of 2017. He also reported that some homeowners have mentioned making donations toward this project. James Godfrey stressed the fact that we do not have $90,000 just sitting in an account it rises and falls with the incoming of dues. His concern would be depleting our funds and then having an unexpected expense from a water system problem or a hurricane. Depending on the extent of it, if our funds get too low it could lead to an assessment or an increase in dues.
Don Mitchell made a motion to proceed with the curtain project and to advance no more than $14,000 from the general fund to be repaid between the 2016 and 17 banquets. Hugh seconded the motion. In discussion Don Gray questioned why we didn’t have a motion simply regarding the approval of the project first before discussing the funding. Don Mitchell reluctantly reworded the motion by saying, “I make a motion we put the wall up and the curtains be #2 project.” James seconded the motion and all board members voted in favor of the project. Don Mitchell then restated the motion regarding the advancement no more than $14,000 from the general fund. Hugh again seconded this motion.
In discussion Louis recognized homeowner, Barry Godwin, to speak from the floor. Mr. Godwin acknowledged that the curtains are a great project but requested that the board wait until we have the funds available. Earl Bunting also spoke from the floor. He said we have been waiting on these curtains since 2013 or 14. People have worked at banquets with the curtains in mind and want to see it done.
At this point there was a great deal of discussion about advancing the shortfall from the general fund. Those who were in favor of doing so didn’t see $14,000 as a large amount of money out of a $350,000 budget knowing it would be repaid in 13 months. Those who were against it were concerned about setting a precedent and risking the possibility of cutting our fund balance too low and the possibility of unforeseen expenses. Louis called for the vote. Don Mitchell, Hugh Kennedy, and Terry Andrews voted in favor of advancing the funds from the general budget. Don Gray, James Godfrey and Mary Ann Everett voted against doing so. Louis Clark broke the tie with a vote against advancing the funds.
Louis suggested that we clarify the unknowns before moving forward. After the vote was taken there was discussion about soliciting donations. It was decided that the board would reconvene or communicate by email after the banquet to review the funds and any donations that have been collected and make a decision regarding moving forward with the curtains.
Water System
Louis provided an update on the water system. There have been two leaks recently. One was caused by a heavy truck parking on a water line. The cause of the other leak is unknown. The water system is very old and problems are occurring more frequently. Louis wants everyone to be aware that at some point it may become a large expense.
OLD BUSINESS
Fence
A fence was to be installed on top of the concrete barriers at the boat ramp. When the fence installer erected the fence it was obvious that the holes that were already in the barrier were not drilled in straight and the fence was a crooked, unsightly mess. The fence installer indicated that for a cost of 5 to $600, if he could find a proper drill bit, he could attempt to bore new and straight holes in the existing barrier or the barrier could be replaced with 8-foot chain-link fence. Considering the traffic, the chain link fence idea is not appealing. Louis has a meeting planned with Angela, the manager of Goose Creek Resort. It was decided to table any further action regarding this fence until he meets with her. She has the same concerns as we do regarding people going back and forth between the two properties.
MORE NEW BUSINESS
Irrigation System
The area to the right after you come through the entrance has been covered with sod Phyllis Pennington and Linda Sanders have been diligently watering the area with sprinklers. Ron Gordon has presented a plan to install an underground irrigation system inside the gate and a spigot outside of the gate for a total cost of around $400. Mary Ann Everett made a motion that we accept this proposal with the cost not to exceed $500. Terry Andrews seconded the motion and all board members approved.
Due to the appearance of the property across from their home, homeowners, Pam and Barney Barrett, have requested to be allowed to erect a privacy fence along a section of Goose Creek Boulevard at their own expense. The fence would be 8 foot high by approximately 60 foot in length and installed directly across from their home and extending in one direction to just beyond the intersection and down to 125 Goose Creek Blvd in the other. Discussion was had regarding the benefit of having such a fence down the entire length of Goose Creek Boulevard. Barney indicated that a decision was made to go with a full fence he wouldn’t make a donation and thought other homeowners would also. No final decision was made pending Lewis’s upcoming meeting with Angela.
Utility Easement
Hugh Kennedy brought up for discussion the question of whether the utility easement should be used for essentially a public thoroughfare for golf carts. Our rules and regulations do state that homeowners are not drive on their neighbor’s property without permission. While the easement is not specifically considered your neighbor’s property, it is common courtesy that you do not use the easement as a golf cart path. Utilities are in the easement and vehicles should not be parked there.
The meeting was adjourned at 11:20 a.m.
______________________________________ _____________________________
Submitted By Date
June 4, 2016 Annual HOA Meeting
Goose Creek Landing Homeowners Association
Annual Meeting
June 4, 2016
The annual meeting of the Goose Creek Landing Homeowners association was held on June 6, 2015 in the cafeteria of White Oak Elementary School all board members were present. Copies of the Goose Creek directory were available to the homeowners and homeowners were asked to provide any updates to Jamie Bushkar. With approximately 40 homeowners in attendance, the meeting was called to order at 9 a.m. by president, Earl Bunting.
Upon opening the meeting Earl announced that our CPA, Ken Banks would not be able to attend the meeting to due to having a heart attack on June 5th. Due to this unfortunate event, the usual financial statements were not available for review at this meeting. Earl then asked that all new homeowners introduce themselves. Ricky Rhodes of Lot# was the only new homeowner to attend the meeting.
Election of Board of Directors
Earl opened the floor for nominations. None were made and Terry Andrews made a motion that nominations be closed. The motion was seconded and the nominations were closed. Because there were only three candidates running for the three open positions, according to Robert’s Rules of Order they could be elected by acclamation. Jimmy Broughton made a motion that they be elected by acclamation and the motion was seconded by Terry Andrews. All in attendance were in favor. As the only new board member, Don Gray was given the opportunity to address the attendees. The incumbent board members are Louis Clark and Don Mitchell. The returning board members are Terry Andrews, Hugh Kennedy, James Godfrey and Mary Ann Everett.
Review of Budget
During the prior year we have stayed within budget and there is no need to increase home-owner€™s dues. Our 20% fund balance remains intact. The 2016-2017budget is not available for review due to Mr. Banks illness. The board will make a plan for presenting the budget to the homeowners. Mailboxes would have been $22,000 if we had to pay for them but fortunately they were provided for free by the US Postal Service all other enhancements were split between General funds and enhancement funds. We have increased the overall budget from $355,000 to $358,000. We anticipate a slight increase in the cost of waste disposal and anticipate that some dredging may be necessary in the near future.
Remarks from managing agent
Janie opened by commending everyone on the excellent manner in which we are maintaining our properties. She thanked everyone who has taken time to send her a note or give her a call to congratulate her on her retirement. She thanked those who have helped her meet her obligations at the annual meeting, helped with the computer and helped with our directories.
She reviewed the usual and customary problems we have with speeding, underage drivers on golf carts and reminded homeowners that we are responsible for the actions of our guests. All boat trailers, jet ski trailers and golf carts are supposed to have Goose Creek Landing stickers on them. Please see Phyllis to get those if you do not have them. Your lot number is supposed to be on your meter box and your golf cart. All trash should be bagged and you should only place household garbage in your trash bin. Lawn chairs, furniture and vegetative debris will not be collected. Failure to clean up behind pets is an ongoing problem. A $30 deposit is required to use the picnic shelter. The $30 is refunded if the area is cleaned and left as it was found. The trash cans should be pulled out and fans turned off. If the shelter is used after 8 p.m. the toilets in the restroom on the back should be flushed and all water turned off.
She thanked the Board and the homeowners for making Goose Creek Landing the best place to live on the coast. She added that retiring is bittersweet and it has been a pleasure to be the GCL manager.
Earl took the floor to express the board’s appreciation for her service. As a token of our appreciation for her 17 years of service the board is paying her dues that would be due in January 2017.
Earl then discussed our efforts to develop a job description, the advertising and interview process and our decision to hire Phyllis Pennington as our new manager. He then introduced Phyllis and then she addressed the attendees.
Enhancements
Terry Andrews reviewed the enhancements that have been completed. He thanked everyone who helped with the replacement of the mailboxes and building the shelter, particularly Ricky Rhodes who provided some of his crew for the labor force.
The dividing wall at the waterfront has been painted.
Gravel has been brought into the waterfront area and graded into the path and cart parking area.
The post and rope fencing has been an ongoing maintenance issue for years. A plan has been approved for a decorative, masonry, two-sided wall to be constructed in it’s place. The wall will be approximately 20 inches high. There will be columns and curbing in front of the pool with some type of center feature. The plan is to have this wall completed before the banquet in September
A request has been made that some type of curtain be placed on the picnic shelter to provide protection in the winter. The options for this are being explored in hopes of finding a cost effective solution.
NEW BUSINESS
The Gate
A new gate has been installed. All motor boxes were replaced. It is important that you let the arm raise up completely before proceeding through. The scanning mechanism was not replaced. If I contractor who is working for you at your home breaks the gate, you are responsible for the damages. You will need to address it with the contractor.
Lawn Maintenance
A RFP was out 4 are lawn maintenance and the contract was awarded to the lowest bidder, Wood€™s Lawn & Landscaping. They are doing a great job cutting it once a week and at the manager’s discretion for $175 a week.
Enhancement Banquet
The banquet will be held on Labor Day weekend, Saturday, September 3rd. Don Mitchell will be the chairman of this year.
Don Mitchell asked for input homeowners regarding what activities they would like to have for children at the banquet. He hopes to have more interaction among the attendees rather than them just coming to eat and leave. His number is 919-920-6411. He welcomes input from the homeowners.
Accessory Building Change
Homeowners are now allowed to have an accessory building up to 360 sq ft with no more than 250 sq ft for shelter. It may not be attached to the home. This change has been conveyed to the homeowners via a notice that was included with the invoice for dues and will be posted on the website.
Architectural Committee
An Architectural Committee made up of the board president, the manager, and two members at large has been formed to review all major construction. Minor building will still be reviewed by the president and the manager.
General discussion
There was general discussion regarding the difficulty of seeing Red Barn Rd when approaching from the east. Several ideas were discussed including contacting the resort side about putting LED lights on the billboard or putting up our own sign at the intersection.
The meeting adjourned at 11:15 am
June 6, 2015 Annual HOA Meeting
Goose Creek Landing Homeowners Association
Annual Home Owners Meeting
June 6, 2015
The Annual meeting of the Goose Creek Landing Home Owners Association was held on June 6, 2015 in the cafeteria of White Oak Elementary School. All board members were present. Approximately homeowners were in attendance. The meeting was called to order by President, Earl Bunting at 9:00 am.
Earl opened the meeting by welcoming all new home owners and asking them to introduce themselves.
The first order of business was to select the Board of Directors. Earl opened the floor and asked that nominations be made by a show of hands. No nominations were made and Earl asked for a motion to close the nominations. That motion was made by Louis Clark and seconded by Don Mitchell. Each candidate was given 2 minutes to speak to the attendees. Those who spoke were James Godfrey, Hugh Kennedy, Mary Ann Everett, Mike Beach, Terry Andrews, and James Taylor. After each candidate spoke those who had not voted were given a few minutes to do so before the voting was declared closed and the counting began.
Ken Banks, CPA provided a handout of the Budget, Financial Position, and Revenue and Expenditures. He reviewed each of these financial statements. The document is available with the original of the minutes. Mr. Banks encourages residents to be conservative so that we can avoid an increase in dues for as long as possible. He answered questions from homeowners and provided his email address so that homeowners can easily contact him during the year if they would like. His email address is [email protected]
Janie Bushkar, managing agent, spoke the attendees. She commended everyone one keeping their homes looking nice and taking an interest in our community. She thanked the people who send her notes and comments that let her know that she and Gene are appreciated. She reminded everyone of our rules that continue to be broken on a regular basis.
1) Speeding ‘ speed limit throughout the community is 15 mph
2) Failure to stop at stop signs. All vehicles, including golf carts, must stop at stop signs
3) Unlicensed drivers driving golf carts. Sometimes an adult is even with them.
4) Stickers should be on the left side of your boat windshield, trailer and golf cart.
5) Trash should be bagged and the cans should be kept clean.
6) Cans are for household garbage only. Debris, lawn chairs and furniture should be taken to disposal site.
7) Meter bases should have your Lot # on it.
8) Inform Janie if your primary contact phone # has changed.
9) Do not let your dog run loose. If it is off your lot it must be on a leash.
10) Clean up behind your dog. The chain link fence is not the latrine. Do not take your dog there to do the bathroom and not clean up behind it.
11) Do not cut across anyone™s yard on your golf cart.
12) You must pay $30 to reserve the picnic shelter. It is not considered reserved until the deposit is paid. The deposit is returned after the event.
13) Be considerate. Turn the music on the golf cart so that it does not vibrate inside someone™s home.
14) When leaving the pool at the end of the day put the umbrellas down.
15) Homeowners are responsible for the actions of their guest.
Review of past year’s projects
Concrete under the picnic shelter was demolished and re-poured. This was made necessary because the concrete had deteriorated to the point of being a hazard and the repair had been mandated by the HOA general liability insurance carrier. Prices were obtained from several
Aluminum ladders were placed at the seawall into the jet ski area, at the pier on the left into the jet ski area and on the end of the pier for loading and unloading your boat.
The pool deck has been resurfaced with Cool Coat. The inside of the pool was blasted. Missing tiles were replaced. The tile was re-grouted and the numbers repainted. The pool house has been painted. White shutters have been added over the vents. Earl informed everyone on the measures that were taken to address any moisture problem that may have existed prior to the pool house being painted. Gutters have been added to the building. It has been sealed at the base and the block were sealed on the inside and on the outside. For over a month Earl has been checking the moisture reading with different meters several times a week. To paint the building it could not have moisture more than 16%. Whether tested in the joint or on the block the most he ever got was 12%. The reading was usually 9-10%.
Mary Ann explained the process that was undertaken to put together a bid package to get competitive pricing. Prices were obtained from three different contractors. The job was awarded to Onslow Grading & Paving and is in process now.
The postal service has informed us that our boxes are insufficient and must be replaced. We found the cost of replacement boxes to be $22,000. Upon further investigation, it was determined that the boxes actually belong to the postal service and it is up to them to replace them then began the arduous process of ordering and obtaining the boxes. We will install the boxes under the supervision of the postal supervisor. The boxes will be front opening. They will be grouped closer together and a shelter will be built to cover them. Some of the materials have been ordered. We are ready.
NEW BUSINESS
Enhancement Committee
Terry Andrews presented a plan to eliminate the post and rope dividers that are found at the waterfront. The proposal is for an 18-21 stone wall in essentially the same areas where we have the post and rope now with the openings in the same place. May add some columns and curbs and increase the vehicle parking at the pool. The work can all be done by volunteer forces and can be completed for the cost of less than one enhancement banquet. At this time this is the only project planned for the waterfront. There was some discussion about the use of volunteers and the desire to have some of the younger members of the community offer to help when there is a project to be completed.
Zoning and Set Backs
As a result of homeowners not obtaining permits and following the ordinances of Carteret County and the hefty fines that have been assessed, Earl and Janie have been involved in lengthy discussions with the planning and zoning director about our zoning and setbacks. We are zoned as “non-conforming” which means anything that is destroyed can be rebuilt in it’s original footprint but any new construction must be within the flowing setbacks. On the side ‘ 10™, On the front – 40™ from the center of the right of way (road) to the foremost structure built on the lot. On the back ‘ 5™. If you add onto the home, even if it just touches the mobile home, it must be 15™ off the back line. This applies to what we call the singlewide lots. Other lots will need to clarify the specifics of the setbacks with the county. The required permits from zoning, build environmental departments must be presented to the managing agent before construction begins. Construction must be completed as approved by the inspectors.
Enhancement Banquet
The banquet will be held on Labor Day weekend. We need to continue to spend some of the money to avoid paying taxes on it. The banquet cleared over $16,000 last year. The committee is considering extending the waterfront boardwalk and expanding the sun bathing area. LED lighting has been added underneath the picnic shelter. Plans are to add some under the gazebo.
CONCERNS FROM THE FLOOR
A homeowner brought up her concern about the difficulty of accessing Hwy 24 from Red Barn Rd. She questioned the possibility of petitioning to have a red light installed. Earl explained that the management of the campground had done that in the past a traffic study had been done. He had been informed that the installation of traffic lights is not based on the amount of traffic but rather the number of accidents that occur over a given period of time. Earl said he would speak with the county manager and we can also take with the campground again.
A homeowner brought up his concern about the ongoing drainage problem. He would like to see it addressed as a Goose Creek problem. Earl reported the he has had a well respected engineer assess the situation. The engineer said there is nowhere to drain our run off. We would have to build a retention pond but we have no idea where our water lines are. They would not know where to begin digging.
Our next meeting will be held on March 21, 2015 @ 9 am.
The meeting adjourned at 12:40 am.